Planning Design Construction Drawings Construction Administration

The creation of an addition to this home was a followup to the Kitchen remodeling project. The stonework was provided to match with the existing stone while the wood rain screen siding blends with the rear yard of mature canopy trees. An elevator tower leading to the 3rd floor attic space is incorporated into the volume of the addition but still allowing maximum natural light through the large triple-pane windows.

Wonderful experience working with this client and Bradley Brothers General Contractors, Inc. for the addition and Callas & Cameron on the kitchen renovation project.